Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 109
Show all pagesPage 109 1 The exception to this is the upgrades to 2 the lightning protection system for the site. As 3 part of this, we will be removing two existing 4 70-foot-tall lightening masts and replacing them 5 with six new lightening masts that are the same 70 6 foot in height for a net increase of four lightening 7 masts. 8 The remainder of the lightning protection 9 system is comprised of shorter masts of an 10 approximate height of 45 feet. And this upgrade is 11 to support protecting the critical electrical 12 equipment from lightning strikes. 13 Also within this section, I have provided 14 an elevation view going up to Prospect. This would 15 be Prospect Ave. on this side. As you can see, the 16 station does elevate as it approaches the roadway, 17 thereby giving the appearance a lot of this 18 lightning protection is lower from where the public 19 would be on roadways, et cetera. 20 The next item I'll be discussing is the 21 lighting within the station. So I will move ahead 22 to page 15 of the same M-3 development plans. This 23 drawing is titled -- as it's loading here. 24 So this drawing is the ultimate lighting 25 distribution plan, the outdoor substation lighting
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes