Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 11
Show all pagesPage 11 1 EIS memorandum. 2 And so I just wanted to note that since 3 the last meeting on August 15th, we did do a 4 resubmission. It included some updated landscaping 5 plans, including updated removal plans, as well as 6 details and updated landscaping plans and details. 7 And then we also submitted an EIS 8 memorandum. That was in accordance with the 9 comments raised by Chairman Neuer at the beginning 10 of the last meeting. We met with the planning 11 director, acting planning director, and did, in 12 accordance with that meeting, prepare the 13 memorandum, as well as a response letter to prior 14 comments that were received. 15 In addition to that and since that time, 16 we've received an updated report from the Board 17 engineer and we also received comments back from the 18 township forester indicating that the applicant does 19 comply with not only the existing but the new tree 20 ordinance, which is an important consideration for 21 the testimony you'll hear this evening. 22 And so with that, I'd like to go back to 23 the public portion of the hearing as it relates to 24 Mr. Briones' testimony. 25 CHAIRMAN NEUER: Thank you.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes