Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 111
Show all pagesPage 111 1 all proposed lights can be provided. 2 Thank you. That does conclude my 3 testimony. 4 ACTING CHAIR SCHWARZBAUM: Okay. Mr. 5 Copa, one question I have is, are there any 6 underground connections and wires being put in the 7 substation on the equipment? 8 THE WITNESS: Yes, there will be some 9 new -- there will be new underground work being put 10 in essentially to reconfigure the circuits to -- as 11 we showed earlier. I'm just going to highlight 12 where the existing equipment is. We will need to 13 provide some additional underground work to support 14 getting the existing circuits that go to the 15 existing equipment located in approximately these 16 three locations. 17 We have to get the existing circuits over 18 to the location for the new switchgear. So we are 19 installing some -- an additional run of manholes 20 located right here that run down and connect to our 21 new switchgear unit. 22 ACTING CHAIR SCHWARZBAUM: And how far -- 23 how deep do you need to go? 24 THE WITNESS: Those duct banks are 25 generally 6 to 8 feet below grade.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes