Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 112
Show all pagesPage 112 1 ACTING CHAIR SCHWARZBAUM: Okay. Fine. 2 Okay. 3 I'm going to go to Board members. We're 4 going to go in reverse order. 5 Mr. Sussman, do you have any questions? 6 COMMISSIONER SUSSMAN: I have no questions 7 of this witness. Thank you. 8 ACTING CHAIR SCHWARZBAUM: Okay. 9 Mr. Scott? 10 COMMISSIONER SCOTT: Thank you. 11 Mr. Copa, regarding the equipment, this is 12 permanent equipment that is going to be placed at 13 the site? 14 THE WITNESS: Yes, that is correct. 15 COMMISSIONER SCOTT: Okay. And it's your 16 testimony that the trees that need to come down, 17 that you are recommending come down, that that is 18 absolutely necessary for the siting of this 19 equipment? 20 THE WITNESS: Correct. It is necessary 21 for the switchgear to be located in the area it is 22 because, as I've drawn in the yellow boxes, this is 23 where the existing 26 kV circuits are all currently 24 located. And to maintain the station operating as 25 it is currently, our new equipment has to be
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes