Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 113

Show all pages
Page 113

Page 113 1 installed outside of those areas so that we can do a 2 construction sequence, cutover sequence, to make 3 sure that we maintain operation of the station as 4 normal during the entirety of construction. 5 COMMISSIONER SCOTT: I understand. 6 So that would be to maintain the current 7 flow of electricity? 8 THE WITNESS: Correct. 9 COMMISSIONER SCOTT: I see. I understand. 10 Thank you very much. That concludes my questions. 11 Thank you. 12 ACTING CHAIR SCHWARZBAUM: Mr. Ricci? 13 Ricci. Sorry. 14 COMMISSIONER RICCI: Yes. 15 Mr. Copa, very good presentation. 16 Question. Am I correct in saying that all 17 of the upgrade -- electrical upgrades that are being 18 done are really to maintain the size of the service? 19 You're not doubling the size of this electrical 20 transfer station, are you? 21 THE WITNESS: That's correct. Yeah, this 22 is maintaining the size of the service, just 23 upgrading it from equipment that ranges anywhere 24 from, right now, 20 to some of the equipment is 25 close to that 100 years when the station was

File revisions (1)