Page 117 1 Some of the equipment within those switchgears 2 might have to be replaced as part of it, but the 3 building itself is in that 50-ish year-like 4 cycle. 5 MR. HESS: Great. Thanks. That's all the 6 questions I have. 7 ACTING CHAIR SCHWARZBAUM: Okay. We will 8 go to public questions. 9 MEETING MODERATOR: We have Kevin Malanga. 10 Do you want to take him first? 11 ACTING CHAIR SCHWARZBAUM: Sure. 12 CROSS-EXAMINATION 13 BY MR. MALANGA: 14 Q. Mr. Copa, good evening. 15 How was the number of lightening masts 16 determined? 17 A. Yeah. Similar as I was describing 18 earlier, the calculations on the lightening masts, 19 they give us a radius of protection that they 20 protect based on the height of the equipment they're 21 protecting, and then that goes through an iterative 22 process to optimize the number of masts that would 23 be needed for the site. 24 Q. So presently on the site it is 25 underprotected?

File revisions (1)