Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 119
Show all pagesPage 119 1 A. Correct. 2 Q. There's no other place on this site? No 3 room for modifying the location of this equipment? 4 A. That is correct. 5 Q. So it can't be moved 10 feet in either 6 direction? 7 A. It could be moved that way. However, we 8 have minimized to keep the minimum amount of 9 clearance between our existing equipment and the new 10 switchgear to, therefore, minimize the impacts to 11 additional things. So it could be moved; however, 12 any moves would just increase our new area of 13 disturbance we would need to provide for the site. 14 Q. So is it possible for the equipment to be 15 moved to the north? 16 A. It is not. Because as I've drawn here in 17 this yellow box, we have existing equipment that 18 needs to stay in service while our new switchgear 19 unit is installed. 20 Q. And is it possible for it to be moved to 21 the west? 22 A. We cannot move it further to the west 23 because there is a duct bank here, as well as we 24 need to maintain clearance from our existing 25 transformer unit for fire protection purposes.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes