Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 125
Show all pagesPage 125 1 PSE&G's internal vegetation management team for 2 their approval of plant placement and species 3 selection. 4 We also strive to be compliant with city 5 ordinances to the greatest degree possible given 6 site constraints, including existing overhead street 7 wires and underground municipal utilities, in 8 conjunction with the safety and security setbacks 9 mandated by those federal and state regulations. 10 With regard to the plantings themselves, 11 we choose commercially available plant material. We 12 prioritize low-maintenance native plants that do not 13 require intensive care over time. They are also 14 selected to create visional seasonal interest in the 15 form of spring flowers or summer flowers, fall 16 foliage and winter texture while also providing 17 screening to the equipment beyond to the greatest 18 degree possible. 19 With regard to the landscape plan, I'm 20 going to share my screen. You should see a 21 rendering of the plan right now. 22 So the landscape package that was 23 submitted for the application includes the tree 24 removal and the proposed landscape design that was 25 developed by PS&S. It was dated 12/22/2022. That
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes