Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 128

Show all pages
Page 128

Page 128 1 second CME review letter that was received in 2 September, a week ago, with a concern about their 3 establishment due to the size. We do not believe 4 this is a concern, but we are willing to work with 5 the town engineers and town forester for the correct 6 mix of sizes. 7 With regard to the tree planting or the 8 tree placement and constraints, the area along 9 Prospect Avenue on the rendering shows the 10 underground constraints in the work area. The area 11 designated in yellow is an existing gas line. The 12 areas designated in red are new underground utility 13 runs. We are maintaining a 20-foot no planting area 14 for new plants along those utility runs. 15 The new plantings overall supplement a 16 predominantly mature deciduous existing landscape, 17 as you're familiar with, with existing trees only 18 selectively removed to accommodate the new station 19 utility runs and fence or to clear trees in poor 20 health and considered a safety concern. 21 The proposed plants include a variety of 22 plant material, including new evergreen trees to 23 provide year-round screening and texture, a number 24 of deciduous tree species to supplement the existing 25 deciduous tree cover, including ornamental trees to

File revisions (1)