Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 130
Show all pagesPage 130 1 that may now be preserved that gives our team a 2 better understanding of the construction logistics 3 of the project. 4 Moving down to the corner of the plan, we 5 have continued to amend the plan to include 6 additional plant species to screen the station from 7 the corner and have infilled the planting along 8 Mount Pleasant Avenue with additional evergreen 9 trees in front of the bioretention basins. And 10 that also was in response to comments from the site 11 plan review technical meeting which was held in 12 July. 13 Other items updated on the plan from the 14 CME review include the requirement for a tree 15 removal permit prior to disturbance; a requirement 16 for tree protection fencing to be installed prior to 17 disturbance through the duration of construction. 18 And we have amended several of the proposed species 19 based on the review concerns. 20 We have also received and reviewed two 21 letters from the town forester, Walt Kipp. They 22 were dated 7/26/2024 and 9/6/2024. 23 The updated plans submitted for tonight's 24 hearing includes revisions per the 7/16 comments and 25 those were subsequently confirmed to be in
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes