Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 132

Show all pages
Page 132

Page 132 1 depth of material here. 2 And this plant material that you see is 3 going down the slope a little bit, this is 4 evergreen material. So as opposed to the proposed 5 view here where you're going to see straight 6 through, there will be evergreen kind of material in 7 the middle of the planting to help shield the view 8 year round. 9 And it's a similar case as we move around 10 the site. This is the corner of Mount Pleasant and 11 Prospect. Same thing with the existing, with the 12 tall canopy. We are supplementing the Dogwoods with 13 some more evergreen material here, which is the 14 darker plant material that you can see in the 15 background. That extended down to the station 16 entrance that was previously discussed over here. 17 And then, similarly, at the station 18 entrance, we are coming back behind the proposed 19 fence line and we're proposing a number of 20 evergreen trees, specifically here trying to 21 create more of a wall of evergreen over time as 22 they grow and do fill in and will top out likely 23 in the 20-foot area, I would expect, and grow 24 together. So you'll have more of a green wall here 25 in time.

File revisions (1)