Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 134

Show all pages
Page 134

Page 134 1 be nonviable. They're suffering in terms of their 2 health. 3 ACTING CHAIR SCHWARZBAUM: Okay. 4 THE WITNESS: Or they're already dead. 5 ACTING CHAIR SCHWARZBAUM: Okay. So let's 6 go through. So go back and let's take where the 7 equipment is. 8 THE WITNESS: The equipment right here. 9 ACTING CHAIR SCHWARZBAUM: Okay. So how 10 many trees are we removing due to the installation 11 of the equipment? 12 THE WITNESS: I have that number for the 13 equipment and the circulation. I have about 35 14 trees. 15 ACTING CHAIR SCHWARZBAUM: Okay. So you 16 have another -- okay. So I'll do the math. So 35. 17 We have approximately 87 trees that you're removing 18 that are not due to the equipment. 19 THE WITNESS: That are due to site 20 improvements. So it's either proximity to the 21 fence, its underground storm line that's going in, 22 for example, along Mount Pleasant. It's the duct 23 banks that are going in, the underground conduit 24 that are going in that we just heard about in the 25 testimony, or the bioretention basins.

File revisions (1)