Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 137
Show all pagesPage 137 1 these clusters up here. 2 As we move down the site, down Prospect 3 Avenue, here we get into one of the underground 4 conduits. Obviously, we have trees right in that 5 alignment so those trees are being slated to be 6 removed. 7 ACTING CHAIR SCHWARZBAUM: How many are 8 being removed for the underground conduit? 9 THE WITNESS: It depends on the location. 10 I don't have a number for -- 11 ACTING CHAIR SCHWARZBAUM: No, where we 12 are. I want to do it in sections. I think it's 13 important that we do it in sections. 14 THE WITNESS: I have four in this section. 15 ACTING CHAIR SCHWARZBAUM: Okay. 16 THE WITNESS: Under specifically this run 17 here. 18 ACTING CHAIR SCHWARZBAUM: Okay. And then 19 the trees along Prospect over there are already 20 removed, the ones that are -- 21 THE WITNESS: Correct. That's correct. 22 Anything along Prospect, the only reason they were 23 removed is due to their health. 24 So I'm moving down into the site. We're 25 getting close to where some of that new equipment is
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes