Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 138

Show all pages
Page 138

Page 138 1 going and the road alignment. So there's some 2 grading considerations here. Grading is going to 3 cut into the slope. It's going to detrimentally 4 impact the root systems of these trees. That's why 5 they were slated for removal. 6 ACTING CHAIR SCHWARZBAUM: How many is 7 that? 8 THE WITNESS: I have ten. 9 ACTING CHAIR SCHWARZBAUM: Okay. Go 10 ahead. 11 THE WITNESS: And then moving down, now we 12 get into a cluster by the basins. So obviously we 13 have the equipment on the left, the equipment 14 alignment that's going along the access road here, 15 and then we get into the basin area where these 16 basins are placed. A couple of the trees are in 17 poor health. They've been noted as such I'm being 18 told. 19 ACTING CHAIR SCHWARZBAUM: And how many 20 are being removed here on this basin? 21 THE WITNESS: I have 23 on that basin. 22 ACTING CHAIR SCHWARZBAUM: Okay. 23 THE WITNESS: And that also kind of 24 dovetails with the next underground conduit 25 alignment which has an additional, actually, one

File revisions (1)