Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 140
Show all pagesPage 140 1 removed. For 4170, how far is that from the basin? 2 THE WITNESS: Probably a good -- I'd say 3 probably about 30 feet, 20 to 30 feet I'm guessing. 4 I'm estimating I should say. 5 ACTING CHAIR SCHWARZBAUM: Okay. And 6 just -- all right. Okay. So 4182 is actually in 7 the basin area? 8 THE WITNESS: Yeah, and the grading that's 9 obviously along here. 10 ACTING CHAIR SCHWARZBAUM: And the 11 grading. Go ahead. 12 THE WITNESS: So there's further impact 13 than just the footprint of the basin. There's work 14 around that, there's equipment that goes around it, 15 which will compact soil, impact the soil structure. 16 If roots can't access oxygen and water, eventually 17 they fall into decline. So that's the concern 18 here. 19 Moving down to the corner, we have an 20 additional underground conduit coming in. So 21 there's two trees that are currently still up that 22 are slated for removal. Other trees in this 23 location have been removed already. One tree is in 24 decline. 25 ACTING CHAIR SCHWARZBAUM: Okay. Go
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes