Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 15
Show all pagesPage 15 1 purposes of asking your questions. 2 MEETING MODERATOR: Yes. We have Sally 3 Malanga ready to go. 4 Please state your name and address for the 5 record. 6 MS. MALANGA: Sally Malanga, Ridge Road. 7 CHAIRMAN NEUER: Thank you. Welcome, 8 Ms. Malanga. This is the time for you to ask 9 questions, not to present evidence or testimony. 10 MS. MALANGA: Yes. Thank you. 11 Mr. Briones, when the facilities are 12 updated with new equipment, will the old equipment 13 be removed? 14 THE WITNESS: Yes, that is correct. The 15 old equipment will be removed. 16 MS. MALANGA: And how does that affect the 17 footprint of the equipment? 18 THE WITNESS: So we will be removing -- so 19 for us to install the next portion of our equipment 20 to power up our switchgear, we'll be removing the 21 existing equipment that's currently on-site as a way 22 for us to create the next part of the 23 infrastructure. 24 So we're basically reusing that same 25 footprint that's existing with the old equipment.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes