Page 16 1 We're going to be demoing it and we're going to be 2 constructing new 26 kV equipment on top of that in 3 order to properly feed the switch station or the 4 switchgear itself. 5 MS. MALANGA: Thank you. 6 And one other question. As project 7 manager, did you instruct your team to preserve as 8 many trees as possible? 9 THE WITNESS: As project manager, I've 10 taken the time to reach out to the team to give me 11 the best possible preservation of trees and design 12 in terms of doing the best way for us to install the 13 following substation. 14 This is our current design and our plan, 15 and based on the recommended design and part of our 16 infrastructure for this new equipment, we did put 17 that into consideration. And the following results 18 based on the further testimony that will be 19 presented further later on today with the 20 landscaping architect will cover that answer as 21 well. 22 MS. MALANGA: Thank you. No further 23 questions. 24 CHAIRMAN NEUER: Thank you, Ms. Malanga. 25 Anyone else raising their hand, please?

File revisions (1)