Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 26
Show all pagesPage 26 1 Ms. Porter, please continue with your 2 witness. 3 MS. PORTER: Yes. Thank you, 4 Mr. Chairman. 5 BY MS. PORTER: 6 Q. Mr. Blake, if you could please continue 7 where you left off and reshare your screen. 8 A. Okay. Where was I? I was describing the 9 existing conditions. I think I covered that. 10 Sorry, I had the wrong drawing up. Oh, I 11 was talking about the south -- south half of the -- 12 of the Sheet 3 of 3 of the boundary and topographic 13 survey. 14 So the existing control building is the 15 orangish structure in the middle of the site that I 16 was discussing on the previous sheet. You can see 17 that's kind of where the match line is. Existing 18 equipment and foundations are in this area. The 19 lighter gray is the existing gravel and then the 20 darker gray hatching is the existing access 21 drives. 22 There's currently three access drives at 23 the existing site, as you can see: Two off of this 24 sheet off Mount Pleasant, and then on the previous 25 sheet, on Sheet 2 of 3, in the northernmost corner
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes