Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 27
Show all pagesPage 27 1 off Prospect Avenue. 2 Proposed conditions. I'm going to stick 3 with Exhibit M-1, but I'm going to now go to the 4 site plan, which is dated May 2nd, 2024. This is 5 Sheet 2 of 3 of the site plan. Similar to the 6 survey that I showed earlier, there is a match line. 7 So half the site is split on this sheet and then on 8 the next sheet. 9 The items that are in red are the proposed 10 equipment and access drive. This drawing basically 11 depicts or is overlaid on top of the survey to show 12 what items are new compared to the existing. The 13 proposed upgrade to the existing 26 kV substation 14 yard is anything basically to the right of the main 15 access drive. That is the darker hatch down the 16 center of the pad. 17 Access to the site will be secure and 18 parking for PSE&G -- PSE&G employees will be 19 available on-site through various spots between the 20 equipment and along the internal paths in the 21 station yard. 22 There are three existing access points 23 that I had mentioned earlier and those will be 24 maintained. On the south half, which is where one 25 of the existing access drives, will be updated.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes