Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 28
Show all pagesPage 28 1 It's the one in the center and I will zoom in so 2 it's easier to see. 3 We reconfigured the access drive off of 4 Mount Pleasant in order to better accommodate 5 turning situations from either direction on Mount 6 Pleasant. So the existing drive was very difficult 7 to turn left into the station if you were going 8 eastbound on the road. This will provide better 9 access from either direction. 10 Additionally, there's a gate that is set 11 back 30 feet from the property line which allows 12 enough room for vehicles to pull in and not have 13 the back end of the vehicle hanging out into the 14 road. 15 The two other access points that I 16 discussed earlier will remain the same with no 17 change. 18 The station will also be upgrading the 19 perimeter fence. As you can see, there's a thin red 20 line that basically works its way all the way around 21 the property, up Prospect Avenue. We'll go back up 22 to the previous sheet as it comes up and wraps 23 around, and then it turns back into the station just 24 south of the existing entrance off of Prospect 25 Avenue.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes