Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 29
Show all pagesPage 29 1 This fence will be an 8-foot Ameristar 2 fence. And the removal of the existing fence will 3 happen first, so it will be installed basically in 4 the same location as the current fence. 5 The station -- the station's interior 6 drives will be macadam -- will be a macadam 7 material, and then the rest of the station areas 8 that are the lighter gray hatch will be replaced or 9 updated with new crushed rock gravel. It's a clean 10 rock so there's minimal fines and this is due to 11 safety reasons. So it's not a compacted-type 12 crushed rock, so it does allow for some stormwater 13 mitigation. 14 On this drawing as well, as you can see, 15 the new equipment is expanding to the south. So the 16 existing gray hatched, you can see where it stops. 17 That's the old limits of the station. Because the 18 station is now expanding to the south, we will be 19 adding crushed rock in the areas that are in and 20 around the circle drive. There will also be kind of 21 a perimeter offset from the access road. 22 There are five stormwater management 23 bioretention basins: Three are located east of the 24 main access drive, between the access drive and 25 Prospect Avenue, and then there are two located on
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes