Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 30
Show all pagesPage 30 1 the south side of the property on either side of the 2 access drive. 3 With that, I will give a little more 4 detail on the stormwater management. So the project 5 is considered major development, but it is only 6 required to -- 7 CHAIRMAN NEUER: I'm sorry, Mr. Blake. I 8 apologize again. I'm going to step down from the 9 Chair and ask Mr. Schwarzbaum, our Vice Chairperson, 10 to take over the rest of this meeting tonight. I 11 apologize, but there's a personal family emergency 12 that I have to attend to. 13 So please continue the meeting under the 14 tutelage of the wonderful Irv Schwarzbaum. 15 ACTING CHAIR SCHWARZBAUM: I hope 16 everything is okay with your family. 17 THE WITNESS: I likewise. 18 COMMISSIONER SUSSMAN: Likewise, yeah. 19 THE WITNESS: Hope everything's okay. 20 (Record notes Chairman Neuer is no longer 21 present.) 22 THE WITNESS: All right. So stormwater. 23 The site's considered a major development, but we 24 are only required to treat quantity. A series of 25 bioretention basins and underdrains are proposed to
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes