Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 35
Show all pagesPage 35 1 (Whereupon, exhibit is presented and 2 marked Exhibit A-2 into evidence.) 3 A. On the -- on the top is the existing 4 picture that was taken. I believe it was in 2023, 5 March timeframe, I believe. But it's the existing 6 conditions. What you see right here is the 7 northeast access drive into this substation. As you 8 can see the existing wrought-iron fence that lines 9 the property. 10 And then below is a rendering with the 11 wrought-iron fence removed and in place is an 12 Ameristar fence, which is a product that we use on a 13 lot of electrical substations with PSE&G. 14 ACTING CHAIR SCHWARZBAUM: Can you enlarge 15 the rendering? 16 THE WITNESS: Would you like the top one, 17 the proposed? 18 ACTING CHAIR SCHWARZBAUM: So this way we 19 all can see the Ameristar fence. 20 Okay. Go ahead. 21 A. Next is Viewpoint Number 2, also prepared 22 by Burns & McDonnell, and this would be Exhibit A-3. 23 THE WITNESS: Correct? 24 CHAIRMAN NEUER: Yes. 25 (Whereupon, exhibit is presented and
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes