Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 38
Show all pagesPage 38 1 Ameristar fence because it is much taller than -- it 2 is -- I don't know about much taller, but it is 3 taller than the brick pillars. 4 MS. PORTER: Mr. Vice-Chairman, in the EIS 5 memorandum that PSE&G submitted, there are specific 6 close-up pictures showing the condition of the 7 existing fence as well as the existing brick 8 pillars. 9 ACTING CHAIR SCHWARZBAUM: Thank you. 10 Okay. 11 You can continue, Mr. Blake. 12 THE WITNESS: Okay. I will move on to 13 Viewpoint Number 3 prepared by Burns & McDonnell. 14 This will be Exhibit A-4. 15 (Whereupon, exhibit is presented and 16 marked Exhibit A-4 into evidence.) 17 THE WITNESS: This viewpoint is 18 catty-corner from the station at the intersection of 19 Mount Pleasant and Prospect Avenue. Once again, 20 we'll zoom in on the existing conditions with the 21 wrought-iron fence and the brick pillars and then 22 move down to the proposed Ameristar fencing. 23 Exhibit 4 -- or, sorry, Viewpoint Number 4 24 by Burns & McDonnell, which will be Exhibit A-5, 25 this is the existing gate into the substation that
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes