Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 39
Show all pagesPage 39 1 is being reconfigured. 2 (Whereupon, exhibit is presented and 3 marked Exhibit A-5 into evidence.) 4 A. As you can see, the existing station, the 5 drive comes in at an angle. And then there's also 6 an existing guard shack that is going to be removed 7 as part of this. 8 The fence will be replaced with the 9 Ameristar fence as well. The gate will actually sit 10 back much farther than the current one to allow for 11 a smooth transition in. And it will be a 12 cantilevered sliding gate that will also be by 13 Ameristar to match the fencing. 14 ACTING CHAIR SCHWARZBAUM: And what's the 15 height of that gate? 16 THE WITNESS: It's 8 feet as well. 17 ACTING CHAIR SCHWARZBAUM: Okay. 18 THE WITNESS: And then this is Viewpoint 19 Number 5, also by Burns & McDonnell, and this will 20 be Exhibit A-6. 21 (Whereupon, exhibit is presented and 22 marked Exhibit A-6 into evidence.) 23 A. And this is from the western half of Mount 24 Pleasant Avenue, just a little bit past the existing 25 entrance drive looking back towards the station.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes