Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 41
Show all pagesPage 41 1 A. Yes, that is correct. 2 Q. Okay. Thank you. 3 A. Moving down to the proposed, you can see 4 that, as part of this, we are going to remove all 5 the chain-link fence with barbed wire and replace 6 that with the Ameristar fencing and continue it up 7 to a gate that is much farther up the road. It's 8 not part of this view. 9 COMMISSIONER RICCI: Mr. Chairman, may I 10 ask a question? 11 ACTING CHAIR SCHWARZBAUM: Sure, unless 12 you -- let's -- maybe we should wait until the end; 13 but if it's a quick question, ask it. 14 COMMISSIONER RICCI: Well, I don't know if 15 it is or isn't based on I don't understand what the 16 purpose of these renderings are. And maybe the 17 engineer could tell us, because the renderings show 18 existing and proposed view, same view, except 19 they're night and day. The existing looks very bare 20 and ugly. It was taken in the dead of winter when 21 there's not a single leaf on any of the trees. The 22 proposed shows all this lush greenery. 23 So it's sort of like said, ooh, how could 24 you not say that that's not the better view? 25 But we're really supposed to be looking at
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes