Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 49
Show all pagesPage 49 1 We did put retaining walls on the back 2 side of four of the basins -- one, two, three, and 3 four -- in order to help reduce some of the 4 footprint and the grading that's associated with 5 it. 6 And then a few other items that I'd like 7 to discuss. There's a few corrections on this 8 site plan that I'd like to point out. One is 9 that the switchgear is called out as a two-story 10 and it is not. It's actually a single story. And 11 so we will get that revised on the comment 12 resolution. 13 There's also miscellaneous breaker that is 14 shown just north of this transformer that is shown 15 as proposed and it's actually existing. So we will 16 get that addressed. 17 And then if we go to Sheet 2 of 3 of the 18 site plan, this is called a Cat bank equipment. 19 There is a reconfiguration -- or what we had was a 20 GoBuy from the vendor. It's vendor-supplied 21 equipment. They ended up providing us a different 22 version of the Cat bank. So this will be revised as 23 part of comment resolution. It didn't really change 24 a whole lot other than it did shorten this access 25 drive a little bit. Because it's not as long. It's
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes