Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 53
Show all pagesPage 53 1 COMMISSIONER BARBEE: Keep going. Yeah. 2 Right here. 3 So you see how you have the lush trees 4 there? 5 THE WITNESS: Yes. 6 COMMISSIONER BARBEE: You were saying 7 that's the proposed. So are those trees that you 8 put there? What -- 9 MS. PORTER: That would be a combination 10 of existing trees to remain as well as new 11 plantings. 12 THE WITNESS: Correct. 13 COMMISSIONER BARBEE: Oh, okay. 14 MS. PORTER: So it does reflect -- 15 THE WITNESS: There's a combination, yes. 16 MS. PORTER: -- all of the proposed as 17 well as existing. 18 COMMISSIONER BARBEE: Okay. 19 MS. PORTER: There are also some, as will 20 be explained by the landscape architect, some 21 existing trees which are in poor condition that 22 require removal. So there are various categories of 23 trees which is why our landscape architect needs to 24 walk through, you know, the various types of trees, 25 which ones are being removed and why.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes