Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 59
Show all pagesPage 59 1 That's not our role. 2 So do you have any questions, any further 3 questions, to Mr. Blake? 4 COMMISSIONER EBEN: No, I don't have 5 anything. Nothing now. Thank you very much. 6 ACTING CHAIR SCHWARZBAUM: Okay. Thank 7 you. 8 Okay. Mr. -- Peter, do you have any 9 questions? 10 COMMISSIONER RICCI: No, I'm sorry. No, I 11 do not, Mr. Schwarzbaum. 12 ACTING CHAIR SCHWARZBAUM: Okay. 13 Mr. Scott? 14 COMMISSIONER SCOTT: Good evening. Thank 15 you, Mr. Blake, for your presentation. 16 Sticking with the matter of the trees to 17 be removed, I was looking at the site plan. And on 18 page 6 on the site plan, it shows areas shaded in 19 red for construction, for new construction. Most of 20 the trees that are slated to be removed if approved 21 are around the perimeter of the site. They're not 22 near where the switching equipment would be. 23 So could you please explain why those 24 trees would have to be removed? 25 THE WITNESS: Which trees are you
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes