Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 60

Show all pages
Page 60

Page 60 1 referring to, I guess? Can you give me maybe a 2 little better direction? 3 COMMISSIONER SCOTT: It's in your site 4 plan on page 6 and we're looking at some rather 5 large trees that are slated to be cut down. You've 6 got a 58-inch -- -foot London pine, a 55-foot white 7 ash, a 49-foot London plane. And these are all very 8 large trees. Your renderings don't show very large 9 trees, by the way. But, at any rate, they are not 10 near where the switching station equipment would be 11 installed. I'm wondering why these trees would need 12 to come down. 13 THE WITNESS: Are you referring to this 14 sheet right here, the tree removal plan? 15 COMMISSIONER SCOTT: Yes. 16 THE WITNESS: So our landscape architect 17 will be testifying and will be providing that 18 exhibit when he testifies -- 19 COMMISSIONER SCOTT: Well, that 20 landscaping -- 21 (Unintelligible cross talk; reporter 22 requests one speaker.) 23 ACTING CHAIR SCHWARZBAUM: Okay. 24 Mr. Blake, you did testify in regard to the 25 retention basins that there were specific needs to

File revisions (1)