Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 61
Show all pagesPage 61 1 remove trees. 2 THE WITNESS: Right. 3 ACTING CHAIR SCHWARZBAUM: And, Mr. Scott, 4 tell me if this is part of your question; that your 5 testimony addressed specific trees that needed to be 6 removed in regard to the substation and then there 7 are other trees that are being removed that are not 8 part of the actual construction. 9 So can you at least address those that are 10 being removed due to the construction and the new 11 substation? 12 COMMISSIONER SCOTT: And the switching 13 equipment. 14 MS. PORTER: Right. 15 ACTING CHAIR SCHWARZBAUM: And switching 16 equipment. 17 BY MS. PORTER: 18 Q. Right. Can you walk them through 19 specifically the area of the new equipment and then 20 in swaths of the trees explain what specifically is 21 going in that general vicinity that's necessitating 22 the removal? 23 And then, ultimately, the landscape 24 architect can obviously embellish upon that and 25 explain further out in terms of removal of dead
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes