Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 62
Show all pagesPage 62 1 trees and otherwise. 2 But if you could specifically address it 3 as it relates specifically to the equipment, the 4 duct banks, as well as the stormwater basins, what 5 tree removal is occurring in connection with those 6 specific site features. 7 A. Yes. So I'm going to do kind of a 8 side-by-side of the site plan and the tree removal 9 plan, which is Drawing TR-01 which was provided 10 prior to tonight. It was sent to the Board as an 11 updated plan. 12 In general, though, the areas that are red 13 is new equipment. So the trees where the new 14 equipment is will be removed because we can't have 15 trees in the middle of the station and where the 16 equipment is going to be located, you obviously 17 can't have trees. 18 The bioretention basin -- 19 ACTING CHAIR SCHWARZBAUM: Can you 20 quantify how many trees are being removed in those 21 areas, in each area? 22 THE WITNESS: There is a table on here. I 23 don't know if it's broken down by specific areas, 24 but it does, you know, explain the total tree 25 removal. But I would have to go through and count
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes