Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 63

Show all pages
Page 63

Page 63 1 exactly what is removed for just, you know, the 2 equipment. 3 ACTING CHAIR SCHWARZBAUM: Okay. So we'll 4 continue testimony and then we'll go back to perhaps 5 with the landscape designer/architect. Okay. So 6 that's one area. 7 Continue. 8 THE WITNESS: So then, you know, there's 9 several -- a cluster of trees in this area where now 10 you can see there's bioretention. There's two 11 bioretention basins right there. There are a few 12 trees that are being removed that are over existing 13 duct banks as part of just PSE&G's tree -- you know, 14 or vegetation management requirements. 15 So they are removing some of those with 16 part of these updates. But the access drive is 17 removing some of the switchgear. We'll be removing 18 some. The reconfiguration of the access drive to 19 allow -- had to be reconfigured to allow room for 20 two bioretention basins on the south side of this 21 access drive, so those trees were impacted as 22 well. 23 There's one miscellaneous tree that's 24 being removed over here because of the storm pipe 25 that is being routed back into the city's storm

File revisions (1)