Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 64
Show all pagesPage 64 1 sewer system. 2 And then, as we go towards the north -- 3 and I will change the sheet as well -- there's 4 electrical bus equipment right here that is elevated 5 equipment. And trees can't -- there's a certain 6 requirement that PSE&G has for safety requirements 7 for, you know, reliability so that the equipment 8 isn't hindered by trees. That had to be removed as 9 well. 10 And then we are also doing some additional 11 grading here to tie into the bioretention to help 12 collect some of the stormwater. 13 And that's the -- that's the general area 14 of trees that are being removed due to the upgrades 15 and the requirements to meet New Jersey's green 16 infrastructure requirements. 17 ACTING CHAIR SCHWARZBAUM: Okay. And can 18 you just highlight areas of tree removal that are 19 not related to the reconfiguration of equipment and 20 the items you testified to? 21 THE WITNESS: Based on the legend of this 22 drawing, it does show some additional trees that are 23 being removed. There's an X on them if they're 24 being removed for various reasons. Some are being 25 removed along the fence line depending on their
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes