Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 65

Show all pages
Page 65

Page 65 1 proximity to the fence. Some are being removed 2 because of the type of tree it is. 3 And I will let our landscape architect, 4 you know, divulge into that deeper with, you know, 5 which trees are which and why they're being removed 6 if it's not associated with the actual substation 7 expansion. 8 ACTING CHAIR SCHWARZBAUM: Mr. Scott, do 9 you have any further questions? 10 COMMISSIONER SCOTT: Yes. 11 Mr. Blake, the term "switching equipment" 12 is very vague. Can you give us an idea of the size 13 and how much is the quantity of switching equipment 14 that needs to be put in place in order to conduct 15 the engineering? 16 THE WITNESS: I'm going to defer that to 17 our electrical engineer. I am a civil engineer and 18 that's not my area of expertise. 19 COMMISSIONER SCOTT: Thank you on that 20 one. 21 Okay. There are other trees that are 22 slated to be removed specifically in order to 23 install detention pods. But the trees that are 24 being removed, they're not actually near where the 25 pods would be.

File revisions (1)