Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 68
Show all pagesPage 68 1 that tree preservation is very important to the 2 township, but also stormwater considerations are 3 incredibly important as well as is stormwater 4 compliance. 5 So we are doing what's legally required 6 of the applicant in order to comply with the 7 current stormwater requirements. So it would be up 8 to the township if you request or would like the 9 applicant to reduce that compliance in order to 10 meet a competing public interest in terms of the 11 trees. 12 So that's something I think that the 13 Board should consider in connection with this 14 application. 15 COMMISSIONER SCOTT: Absolutely, and thank 16 you for that clarification. Mr. Blake just said 17 that that could be explored and so thank you for 18 that. 19 Finally, I just want to be sure. Your 20 original application was in compliance with the old 21 tree ordinance for the town. And you said tonight 22 that I believe that was updated to be compliant with 23 the current tree ordinance. Is that correct? 24 MS. PORTER: Yeah, so I had made that 25 statement on the record. That will actually be
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes