Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 73
Show all pagesPage 73 1 In our review letters, we had a series of 2 comments regarding the stormwater design, so 3 obviously the applicant has not submitted revised 4 stormwater calculations. I would ask the -- I would 5 ask Mr. Blake if the applicant has -- if he has 6 reviewed our comments and if they agree to address 7 all of those in subsequent submissions. 8 THE WITNESS: Yes, I have read all the 9 comments and I will provide responses to all those 10 in comment resolution. 11 MR. HESS: Right. Did you see any issues 12 that we need to discuss regarding the comments? 13 THE WITNESS: I don't believe there was 14 anything that was too glaring or that sticks out to 15 me that would be too much of a challenge. I'm 16 looking at my notes right now to see if there was 17 anything that I made note of that would be 18 difficult, but I don't see anything. 19 The bioretention -- I think there was one 20 about bioretention sizing and making sure that 21 there's enough -- 1 foot of, you know, freeboard. 22 MR. HESS: Yes. 23 THE WITNESS: I know that there are some 24 challenges with the seasonal high water table in 25 various locations and trying to get the full extent
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes