Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 78

Show all pages
Page 78

Page 78 1 fence. I know that our rendering group was trying 2 to turn these around and had to reuse, I'm guessing, 3 some previous products that they developed. 4 Q. Uh-huh. 5 A. And if we want to update the renderings, 6 we could fix that if that is something that needs -- 7 would like to be done. 8 Q. Because the information that's attached to 9 the application describes the Trident as "the 10 intimidating look" of the Trident. 11 Is that a look that we want at an 12 intersection, major intersection, in West Orange? 13 A. Well, we're not putting in the Trident. 14 So the plan is to put in the Stronghold, which does 15 not have the pointed top. 16 Q. Now, Mr. Blake, were you involved in the 17 preparation of the tree removal plan? 18 A. I had a little bit of involvement in it, 19 mainly where it was affected by the bioretention 20 basins. 21 Q. So what was your involvement in that 22 regard, please? 23 A. Our design, which had the grading and 24 bioretention design, I provided those extents and 25 gave my recommendation on what trees would have to

File revisions (1)