Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 8

Show all pages
Page 8

Page 8 1 meeting in connection with PSE&G's application. I 2 just wanted to remind the Board and the public that 3 we're here seeking preliminary and final major site 4 plan approval in connection with various use and 5 bulk variances that were described in further detail 6 at the last meeting. 7 This application is specifically for 8 upgrades to remove and replace outdated equipment at 9 the existing West Orange switching station. There 10 are a number of stations in that vicinity. This 11 application concerns only the West Orange switching 12 station which, as Mr. Chairman indicated, is 325 13 Mount Pleasant Avenue. 14 Also as was noted, Mr. Briones, our first 15 witness, who is a fact witness and the project 16 manager for PSE&G, gave a brief overview in terms of 17 the nature and scope of the work that's going to 18 take place at the station in terms of the removal of 19 various existing buildings, the installation of a 20 new one-story 26 kV switchgear enclosure that will 21 house the new addition of the 26 kV switchgear, and 22 feeder reactors. 23 As was also discussed and will be 24 discussed in great detail this evening from our 25 other expert witnesses, the application includes the

File revisions (1)