Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 81

Show all pages
Page 81

Page 81 1 Q. No. Keep going. Keep going. Keep going 2 north. 3 A. Oh, this right here? 4 Q. Yes. 5 A. The reason for that is because it's in the 6 middle of the station. Although there's no 7 equipment, this whole area is part of the station 8 and this will be utilized for, you know, temporary 9 parking if needed. Additionally, this area is all 10 going to be gravel. And so the vegetation 11 requirements from PSE&G's standard veg management 12 doesn't allow trees to be located inside the 13 station. 14 Q. Station proper? 15 A. Station proper, I guess, yes. 16 Q. How many feet from the equipment that's 17 being installed is that tree? 18 A. This is going to be an estimate. What's 19 the scale on this? Thirty scale. So from the 20 switchgear, it's roughly 80 feet. 21 Q. So how is that tree interfering with the 22 switchgear? 23 A. It's not. It's because we're regrading 24 this pad and filling this area. And so not only 25 would the tree be in the way, but this whole area is

File revisions (1)