Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 89
Show all pagesPage 89 1 additional maintenance in connection with repairs or 2 replacement. 3 BY MR. MALANGA: 4 Q. What is the principal access of this site? 5 A. It will be this new access drive off of 6 Mount Pleasant. 7 Q. So you referred to the other driveway as 8 the main access drive. So that's no longer going to 9 be the main access drive? 10 A. There's three main access drives. It 11 depends which part of the station you're trying to 12 get to. There's three different voltage classes. 13 Q. All right. "Main" seems to mean the one 14 that's going to be used the most. Which -- 15 ACTING CHAIR SCHWARZBAUM: Thirty seconds. 16 Q. -- one will be used the most? 17 ACTING CHAIR SCHWARZBAUM: Thirty seconds. 18 A. Mr. Malanga, I cannot answer that question 19 because I am not a PSE&G employee nor do I do 20 maintenance on these substations. I would say that 21 all three access drives will be utilized. They're 22 currently utilized and if this site is constructed, 23 all three will still be utilized. 24 Q. Who decided where the -- 25 ACTING CHAIR SCHWARZBAUM: Okay. Hold up.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes