Page 92

Page 92 1 BOARD SECRETARY: Thank you. 2 MS. RUDIN: So this first entrance you are 3 reconfiguring. Is that correct? 4 THE WITNESS: Yes, that is correct. 5 MS. RUDIN: And the reason you're 6 reconfiguring it is so that there can be a turn from 7 the right lane directly into that driveway? 8 THE WITNESS: Correct. It provides better 9 access turning in this way; or, if you were driving 10 westbound, you could turn in as well. 11 MS. RUDIN: Correct. But there are two 12 other entrances to this substation, correct? 13 THE WITNESS: Yes, that is correct. 14 MS. RUDIN: So isn't it possible to leave 15 the entrance exactly the way it is and have the 16 trucks or the utility vehicles enter in if they 17 are -- into a different entrance instead of widening 18 this one, which will negatively impact so many of 19 the trees that are right around there, including 20 trees that would be considered on the New Jersey big 21 tree list? 22 THE WITNESS: The curb cut is almost -- 23 MS. RUDIN: You have two other entrances. 24 THE WITNESS: Yeah, but the curb cut -- 25 MS. RUDIN: Can't the truck either --

File revisions (1)