Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 97
Show all pagesPage 97 1 provide an updated fence that meets PSE&G's safety 2 standards. 3 ACTING CHAIR SCHWARZBAUM: Okay. Next. 4 Next resident. Megan? 5 MEETING MODERATOR: Yes, I'm sorry. Yes. 6 We have Sally Malanga. Please state your name and 7 address for the record. 8 MS. MALANGA: Sally Malanga, Ridge Road. 9 Mr. Blake, would it be fair to say that 10 when residents drive by the PSE&G facility on Mount 11 Pleasant, they see a parklike setting filled with 12 large trees? 13 THE WITNESS: That's an opinion that I 14 don't have because I've never driven by the site. 15 MS. MALANGA: Would it be fair to say that 16 if it -- since we are residents and we do consider 17 it a parklike setting, that that setting is to be 18 clear-cut based on the tree cutting plan? 19 MS. PORTER: This is outside the scope of 20 this particular witness. We specifically indicated 21 the landscape architect would address specifically 22 the tree removal and replacement. Other than what 23 this particular witness testified to, which is 24 specifically the removal in connection with where 25 the equipment is situated or the basin, that is his
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes