Supporting Documentation · Oct 17, 2024
9 19 24 West Orange BOA ZB 24 06 PSEG Full size
9433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187fIndexed text · page 109
Show all pagesPage 109 1 plus substations. This one has landscaping that exists 2 and that will be replaced. Most of the photos I showed 3 you are actually of city areas where we have used the 4 decorative fence with 20-foot brick spacing to provide 5 something decorative to look at. 6 In this case we believe that with the trees 7 and the new fence which is 8-feet high we think 30 feet 8 between pillars will be sufficient. We have tried 9 10-foot spacing, we find that to be too busy, too 10 distracting. 11 MR. MALANGA: What is the present distance 12 between the brick piers? 13 THE WITNESS: Twenty. 14 MR. MALANGA: And why would you not use 15 20 feet for this site? 16 THE WITNESS: Because of the existence of 17 copious trees and even more trees that we will be 18 replacing. 19 One concern we have is that installing the 20 brick pillars may cause additional trees to be removed. 21 We do not want that. In fact, we propose that we work 22 out the engineering details with the Board 23 professionals. What we do not want is during 24 construction we attempt to install a pier and find out 25 -- or a pillar and find out that there is something
File revisions (1)
- Sep 29, 2026
9433fd033100683,324 bytes