Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 17, 2024

9 19 24 West Orange BOA ZB 24 06 PSEG Full size

Preserved file SHA-2569433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187f

Indexed text · page 113

Show all pages
Page 113

Page 113 1 MR. MALANGA: You mean the Resolutions of 2 approval for this site? 3 THE WITNESS: Yes. 4 MR. MALANGA: All right. Does this 5 chain-link fence encircle the existing equipment at the 6 site? 7 THE WITNESS: To my knowledge it encircles 8 the 230kV yard. 9 MR. MALANGA: Would it not be possible to 10 use a similar approach and use a chain-link fence on 11 the interior of this site to encircle the proposed 12 equipment? 13 CHAIRMAN NEUER: I don't understand the 14 question. 15 MR. MALANGA: I'll try to rephrase that, 16 Mr. Chairman. Would it not be possible to encircle the 17 proposed equipment by a chain-link fence so the 18 fence -- the new chain-link fence would be on the 19 interior of the site, not on the perimeter of the site, 20 and maintain a lower fence on the perimeter? 21 THE WITNESS: I apologize that I cannot 22 answer as I am not a security expert. 23 MR. PORTER: And objection. That would 24 call for a specific design and engineering information, 25 to which this witness does not have personal knowledge

File revisions (1)