Supporting Documentation · Oct 17, 2024

9 19 24 West Orange BOA ZB 24 06 PSEG Full size

Preserved file SHA-2569433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187f

Indexed text · page 125

Show all pages
Page 125

Page 125 1 feel that the proposed design and specific layout is 2 necessary in order to provide safe and reliable 3 electric service? 4 THE WITNESS: I do. 5 MR. PORTER: One further question. In 6 connection with your specific discussions and 7 conservations with the project team, was careful 8 thought and coordination done in connection with the 9 siting, specifically as shown on the site plans that 10 are before this Board? 11 THE WITNESS: Yes. I've been involved in 12 this project for four years. 13 MR. PORTER: Thank you. I have no further 14 questions. 15 CHAIRMAN NEUER: Anything else, Ms. Porter? 16 MR. PORTER: Not at this time. 17 CHAIRMAN NEUER: Okay. Thank you, Ms. 18 Merainer. Ms. Porter, the clock on the wall says it's 19 getting to that time. We're not going to have time for 20 any furthers witnesses. 21 How many more witnesses do you anticipate 22 calling before your case is completed? 23 MR. PORTER: So at this time we do not have 24 any further witnesses. We do have other individuals 25 available to the extent that the Board would like to

File revisions (1)