Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 17, 2024

9 19 24 West Orange BOA ZB 24 06 PSEG Full size

Preserved file SHA-2569433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187f

Indexed text · page 20

Show all pages
Page 20

Page 20 1 trees come down. But if we do see the nature of the 2 work, the proposed plan based on engineering 3 requirements that as I mentioned if there's an 4 improvement, there's grading in relation to that 5 improvement that might detrimentally impact the health 6 of that tree within a short span or even a long span we 7 will recommend that it does get taken down. 8 We also should mention that as part of our 9 process, our design process we work hand-in-hand with 10 PSE&G vegetation management within their internal team. 11 They are beholden to additional authorities that have 12 jurisdiction over these sites. So there are Federal 13 requirements, there are state of New Jersey Board of 14 Public Utility requirements that effectively -- it's 15 based on industry standards. There's an ANSI standard, 16 ANSI standing for the American National Standards 17 Institute. They follow that in terms of the evaluation 18 of trees. Basically anything that's proposed by us or 19 anything that's existing on-site they look at that 20 tree, they look at the species. They look at the 21 proposed, or I should say the habit of the tree, the 22 life-span of the tree, its proximity to their 23 equipment, and based on that it also impacts what can 24 and cannot exist around that equipment. 25 Obviously, reliability is of utmost

File revisions (1)