Page 25 1 BOARD MEMBER SCOTT: I see. That was not 2 you. That was someone else? 3 THE WITNESS: Correct. 4 BOARD MEMBER SCOTT: Would that be the 5 engineer? 6 THE WITNESS: Yes. It's an engineering 7 item. 8 BOARD MEMBER SCOTT: Thank you. And did 9 you inform anyone that the construction of the new 10 perimeter fence would necessitate the cutting down of 11 the trees on the perimeter itself? 12 THE WITNESS: There was a conversation. We 13 do have the demo, the demolition of the existing 14 pillars and the installation of the new fence. So 15 there's construction activity all the way around the 16 site along those two frontages. So obviously we were 17 concerned about proximity to existing trees. As I 18 mentioned, the majority of those have already been 19 removed because they were problematic as the previous 20 Forster had identified. 21 As with the remaining trees we actually -- 22 we've kept a number of them along those frontages where 23 the fence line is. 24 BOARD MEMBER SCOTT: Now, the fence that 25 we're discussing that's the outer fence. There is a

File revisions (1)