Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 17, 2024

9 19 24 West Orange BOA ZB 24 06 PSEG Full size

Preserved file SHA-2569433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187f

Indexed text · page 32

Show all pages
Page 32

Page 32 1 Pardon me. 2 THE WITNESS: Same thing. They're 3 identified on the schedule. 4 BOARD MEMBER SCOTT: Yes, but can you 5 identify them on this map for us as to where they are? 6 THE WITNESS: I believe there's a grouping 7 down by this fire retention basin. 8 BOARD MEMBER SCOTT: And what about the 9 Norway Spruce along Prospect Avenue? 10 THE WITNESS: Norway Spruce I believe are 11 along the fence line. 12 BOARD MEMBER SCOTT: And why are 13 specifically the Horse Chestnut and the Norway Spruce 14 being slated to be cut down? 15 THE WITNESS: It would be due to the 16 improvements. Anything as I mentioned around the 17 bioretention basin, the installation of that and the 18 grading required to place that, that would cause the 19 removal because it would be detrimental to the root 20 zone. And anything up here it would either be fence 21 and pillar related, or really health related only at 22 this point. A lot of the ones that had issues have 23 already been removed. 24 BOARD MEMBER SCOTT: You're saying 25 specifically the Norway Spruce that would be cut down

File revisions (1)