Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 17, 2024

9 19 24 West Orange BOA ZB 24 06 PSEG Full size

Preserved file SHA-2569433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187f

Indexed text · page 35

Show all pages
Page 35

Page 35 1 provisions of our Ordinance. 2 BOARD MEMBER SCOTT: Thank you. I'll come 3 back to that one. 4 Mr. Futey, have you ever designed a 5 landscape project where underground stormwater 6 detention tanks were utilized? 7 THE WITNESS: Detention tanks? 8 BOARD MEMBER SCOTT: Yes. 9 THE WITNESS: I have but they've generally 10 been in parking lots. 11 BOARD MEMBER SCOTT: Not at substations? 12 THE WITNESS: No. Not in the projects I've 13 been involved in. 14 BOARD MEMBER SCOTT: Did you ever ask Mr. 15 Blake if it were possible to build underground 16 stormwater detention tanks to enable preserving the 17 trees on the site? 18 THE WITNESS: I did not. 19 BOARD MEMBER SCOTT: Is that commensurate 20 with trying to design a project to save as many trees 21 as possible? 22 THE WITNESS: Well, that again gets into 23 more technical engineering issues with the site in 24 terms of the area that's required by other regulations. 25 So again, the improvements proposed by Burns and

File revisions (1)